
Proceedings Paper
Stress measuring and monitoring for main tower of Guangzhou Pearl River HuangPu BridgeFormat | Member Price | Non-Member Price |
---|---|---|
$17.00 | $21.00 |
Paper Abstract
Stress measuring and monitoring play an important role in the construction monitor for HuangPu Bridge in Guangzhou
Pearl River, and it ensure the construction safe and normal status of finished bridge. The strain of concrete includes not
only the elastic strain resulted from the load effect, but also the non-elastic strain resulted from the creep and shrinkage
of concrete. The difficulty for separating creep and shrinkage is the determining for the creep coefficient. A partial site
test on creep and shrinkage for the concrete is carried out. The parameters of prediction model CEB-FIP1990 are
modified, and some expressions for creep and shrinkage, which are suitable for this project, are acquired. Based on the
linearity principle of superposition, the concrete's elastic stress is calculated, and the creep and shrinkage can be
separated more accurately.
Paper Details
Date Published: 25 August 2009
PDF: 7 pages
Proc. SPIE 7375, ICEM 2008: International Conference on Experimental Mechanics 2008, 73754G (25 August 2009); doi: 10.1117/12.839306
Published in SPIE Proceedings Vol. 7375:
ICEM 2008: International Conference on Experimental Mechanics 2008
Xiaoyuan He; Huimin Xie; YiLan Kang, Editor(s)
PDF: 7 pages
Proc. SPIE 7375, ICEM 2008: International Conference on Experimental Mechanics 2008, 73754G (25 August 2009); doi: 10.1117/12.839306
Show Author Affiliations
Wei-feng Wang, South China Univ. of Technology (China)
Jian-dong Liang, Guangzhou Design Institute (China)
Published in SPIE Proceedings Vol. 7375:
ICEM 2008: International Conference on Experimental Mechanics 2008
Xiaoyuan He; Huimin Xie; YiLan Kang, Editor(s)
© SPIE. Terms of Use
