Share Email Print
cover

Proceedings Paper • new

Analysis of the cost, schedule, and risk for Lynx mirror assembly production
Format Member Price Non-Member Price
PDF $17.00 $21.00

Paper Abstract

This paper analyzes a recently published model for Lynx Mirror Assembly production duration, to understand the sensitivity of duration to various factors. The factors considered are finite process yield, knowledge of the individual process times and finite server reliability. In all of these cases, closed form estimates are given along with numerical examples. This initial analysis indicates that accurate and precise knowledge of the process times is fundamental to making an accurate prediction of schedule duration. Analysis of the failure of any given server is also explained and can be used as the basis of a rational sparing policy.

Paper Details

Date Published: 30 October 2019
PDF: 9 pages
Proc. SPIE 11118, UV, X-Ray, and Gamma-Ray Space Instrumentation for Astronomy XXI, 111181K (30 October 2019); doi: 10.1117/12.2529696
Show Author Affiliations
Jonathan W. Arenberg, Northrop Grumman Aerospace Systems (United States)
William W. Zhang, NASA Goddard Space Flight Ctr. (United States)


Published in SPIE Proceedings Vol. 11118:
UV, X-Ray, and Gamma-Ray Space Instrumentation for Astronomy XXI
Oswald H. Siegmund, Editor(s)

© SPIE. Terms of Use
Back to Top