
Proceedings Paper
Producibility of Z-technology focal planes in a rate production/highly automated CIM environmentFormat | Member Price | Non-Member Price |
---|---|---|
$17.00 | $21.00 |
Paper Abstract
The transition from the relatively costly, low-rate pilot production of Z-technology focal planes to high-rate production in a cost-effective environment is discussed. The use of computer-integrated manufacturing and automation in this transition is addressed. The proposal process and systems specification in the transition is reviewed.
Paper Details
Date Published: 1 November 1990
PDF: 17 pages
Proc. SPIE 1339, Materials, Devices, Techniques, and Applications for Z-Plane Focal Plane Array Technology II, (1 November 1990); doi: 10.1117/12.23019
Published in SPIE Proceedings Vol. 1339:
Materials, Devices, Techniques, and Applications for Z-Plane Focal Plane Array Technology II
John C. Carson, Editor(s)
PDF: 17 pages
Proc. SPIE 1339, Materials, Devices, Techniques, and Applications for Z-Plane Focal Plane Array Technology II, (1 November 1990); doi: 10.1117/12.23019
Show Author Affiliations
Charles E. Schmitz, Grumman Aerospace Corp. (United States)
Published in SPIE Proceedings Vol. 1339:
Materials, Devices, Techniques, and Applications for Z-Plane Focal Plane Array Technology II
John C. Carson, Editor(s)
© SPIE. Terms of Use
