
Proceedings Paper
DKIST enclosure modeling and verification during factory assembly and testingFormat | Member Price | Non-Member Price |
---|---|---|
$17.00 | $21.00 |
Paper Abstract
The Daniel K. Inouye Solar Telescope (DKIST, formerly the Advanced Technology Solar Telescope, ATST) is unique as, apart from protecting the telescope and its instrumentation from the weather, it holds the entrance aperture stop and is required to position it with millimeter-level accuracy. The compliance of the Enclosure design with the requirements, as of Final Design Review in January 2012, was supported by mathematical models and other analyses which included structural and mechanical analyses (FEA), control models, ventilation analysis (CFD), thermal models, reliability analysis, etc. During the Enclosure Factory Assembly and Testing the compliance with the requirements has been verified using the real hardware and the models created during the design phase have been revisited. The tests performed during shutter mechanism subsystem (crawler test stand) functional and endurance testing (completed summer 2013) and two comprehensive system-level factory acceptance testing campaigns (FAT#1 in December 2013 and FAT#2 in March 2014) included functional and performance tests on all mechanisms, off-normal mode tests, mechanism wobble tests, creation of the Enclosure pointing map, control system tests, and vibration tests. The comparison of the assumptions used during the design phase with the properties measured during the test campaign provides an interesting reference for future projects.
Paper Details
Date Published: 4 August 2014
PDF: 13 pages
Proc. SPIE 9150, Modeling, Systems Engineering, and Project Management for Astronomy VI, 91501S (4 August 2014); doi: 10.1117/12.2059083
Published in SPIE Proceedings Vol. 9150:
Modeling, Systems Engineering, and Project Management for Astronomy VI
George Z. Angeli; Philippe Dierickx, Editor(s)
PDF: 13 pages
Proc. SPIE 9150, Modeling, Systems Engineering, and Project Management for Astronomy VI, 91501S (4 August 2014); doi: 10.1117/12.2059083
Show Author Affiliations
Ibon Larrakoetxea, AEC IDOM (United States)
William McBride, National Solar Observatory (United States)
William McBride, National Solar Observatory (United States)
Heather K. Marshall, National Solar Observatory (United States)
Gaizka Murga, AEC IDOM (United States)
Gaizka Murga, AEC IDOM (United States)
Published in SPIE Proceedings Vol. 9150:
Modeling, Systems Engineering, and Project Management for Astronomy VI
George Z. Angeli; Philippe Dierickx, Editor(s)
© SPIE. Terms of Use
