Share Email Print
cover

Proceedings Paper

An Interim Report For Monitoring Field Installation Of Impact Energy Attenuator By Video Tape Federal-Aid Project D-4-108 December 1972
Author(s): James G. Bell; Jerry B. Baxter; Ross Keeling; Robert Snyder
Format Member Price Non-Member Price
PDF $14.40 $18.00

Paper Abstract

A. General This is an interim report of a Federal-Aid Research Project entitled "D-4-108, Monitoring Field Installation of Impact Energy Attenuator by Video Tape . This project was approved by the FHWA on June 29, 1971. The report presents information gathered to date regarding the equipment and modifications necessary to conduct the study. The conclusion and recommendation will be presented in our final report which will be submitted at the completion of this project in December 1973.

Paper Details

Date Published: 11 October 1973
PDF: 14 pages
Proc. SPIE 0037, New Developments in Optical Instrumentation: A Problem Solving Tool in Highway and Traffic Engineering, (11 October 1973); doi: 10.1117/12.953726
Show Author Affiliations
James G. Bell, Business and Transportation Agency Department of Public Works (United States)
Jerry B. Baxter, Business and Transportation Agency Department of Public Works (United States)
Ross Keeling, Business and Transportation Agency Department of Public Works (United States)
Robert Snyder, Business and Transportation Agency Department of Public Works (United States)


Published in SPIE Proceedings Vol. 0037:
New Developments in Optical Instrumentation: A Problem Solving Tool in Highway and Traffic Engineering
William T. Baker; A. M. White, Editor(s)

© SPIE. Terms of Use
Back to Top