Share Email Print

Proceedings Paper

Study on project schedule management based on comprehensive comparison methods
Author(s): Jun-ying Ge
Format Member Price Non-Member Price
PDF $14.40 $18.00

Paper Abstract

Project schedule management is the central content in project organization plan, which affects the project time and investment. The traditional representation methods of schedule are gant chart, network chart, S curve, etc. With the engineering scale increasing constantly, techniques and management level are improving, single method can not meet the requirements of project schedule management. Comprehensive comparison method gets more and more attention, and has become one symbol of project management modernization with its vivacity and brevity form. The paper analyzes the factors that affect the project, and then compare the progress of the different control methods, finally it made some management measures of project schedule.

Paper Details

Date Published: 1 October 2011
PDF: 6 pages
Proc. SPIE 8285, International Conference on Graphic and Image Processing (ICGIP 2011), 82852P (1 October 2011); doi: 10.1117/12.913585
Show Author Affiliations
Jun-ying Ge, Shijiazhuang Tiedao Univ. (China)

Published in SPIE Proceedings Vol. 8285:
International Conference on Graphic and Image Processing (ICGIP 2011)
Yi Xie; Yanjun Zheng, Editor(s)

© SPIE. Terms of Use
Back to Top