Share Email Print
cover

Proceedings Paper

OLI telescope post-alignment optical performance
Author(s): Michael G. Dittman; Brenda Firth
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

The telescope for the Operational Land Imager (OLI) completed alignment in July, 2009. Environmental testing was completed in September, 2009. This paper presents the as-designed and as-built performance of the telescope and demonstrates compliance to the OLI requirements. Performance parameters to be discussed include: Effective Focal Length, Modulation Transfer Function, Throughput, Polarization and Pointing.

Paper Details

Date Published: 27 August 2010
PDF: 5 pages
Proc. SPIE 7807, Earth Observing Systems XV, 780705 (27 August 2010); doi: 10.1117/12.860869
Show Author Affiliations
Michael G. Dittman, Ball Aerospace & Technologies Corp. (United States)
Brenda Firth, Ball Aerospace & Technologies Corp. (United States)


Published in SPIE Proceedings Vol. 7807:
Earth Observing Systems XV
James J. Butler; Xiaoxiong Xiong; Xingfa Gu, Editor(s)

© SPIE. Terms of Use
Back to Top