Share Email Print
cover

Proceedings Paper

Preliminary multivariable cost model for space telescopes
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. This paper reviews the methodology used to develop space telescope cost models; summarizes recently published single variable models; and presents preliminary results for two and three variable cost models. Some of the findings are that increasing mass reduces cost; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and technology development as a function of time reduces cost at the rate of 50% per 17 years.

Paper Details

Date Published: 4 August 2010
PDF: 11 pages
Proc. SPIE 7731, Space Telescopes and Instrumentation 2010: Optical, Infrared, and Millimeter Wave, 773104 (4 August 2010); doi: 10.1117/12.856214
Show Author Affiliations
H. Philip Stahl, NASA Marshall Space Flight Ctr. (United States)
Todd Henrichs, Middle Tennessee State Univ. (United States)


Published in SPIE Proceedings Vol. 7731:
Space Telescopes and Instrumentation 2010: Optical, Infrared, and Millimeter Wave
Jacobus M. Oschmann; Mark C. Clampin; Howard A. MacEwen, Editor(s)

© SPIE. Terms of Use
Back to Top