Share Email Print
cover

Proceedings Paper

Results, status, and plans for the James Webb Space Telescope optical telescope element
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

The James Webb Space Telescope (JWST) Optical Telescope Element has completed its Critical Design Review and is well into fabrication. This paper will summarize efforts to date in the design, manufacturing and planning for integration and testing. This will include a top level summary of mirror performance to date, hardware results, and planning status for the integration and testing program. The future plans for manufacturing, assembly, alignment and testing will also be summarized at a top level.

Paper Details

Date Published: 4 August 2010
PDF: 8 pages
Proc. SPIE 7731, Space Telescopes and Instrumentation 2010: Optical, Infrared, and Millimeter Wave, 77310A (4 August 2010); doi: 10.1117/12.855796
Show Author Affiliations
Lee D. Feinberg, NASA Goddard Space Flight Ctr. (United States)
Ritva Keski-Kuha, NASA Goddard Space Flight Ctr. (United States)
Charlie Atkinson, Northrop Grumman Aerospace Systems (United States)
Scott C. Texter, Northrop Grumman Aerospace Systems (United States)


Published in SPIE Proceedings Vol. 7731:
Space Telescopes and Instrumentation 2010: Optical, Infrared, and Millimeter Wave
Jacobus M. Oschmann Jr.; Mark C. Clampin; Howard A. MacEwen, Editor(s)

© SPIE. Terms of Use
Back to Top