Share Email Print
cover

Proceedings Paper

Design tradeoffs in the development of the advanced multispectral simulation test acceptance resource (AMSTAR) HWIL facilities
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

The Army's Advanced Multispectral Simulation Test Acceptance Resource (AMSTAR) is a suite of missile Hardware-In-the-Loop (HWIL) simulation / test capabilities designed to support testing from concept through production. This paper presents the design tradeoffs that were conducted in the development of the AMSTAR sensor stimulators and the flight motion simulators. The AMSTAR facility design includes systems to stimulate each of the Millimeter Wave (MMW), Infrared (IR), and Semi-Active Laser (SAL) sensors. The flight motion simulator (FMS) performance was key to the success of the simulation but required many concessions to accommodate the design considerations for the tri-mode stimulation systems.

Paper Details

Date Published: 30 April 2007
PDF: 9 pages
Proc. SPIE 6544, Technologies for Synthetic Environments: Hardware-in-the-Loop Testing XII, 65440D (30 April 2007); doi: 10.1117/12.719683
Show Author Affiliations
Kenneth G. LeSueur, Redstone Technical Test Ctr. (United States)
Frank Joseph Almendinger, Acutronic USA Inc. (United States)


Published in SPIE Proceedings Vol. 6544:
Technologies for Synthetic Environments: Hardware-in-the-Loop Testing XII
Robert Lee Murrer, Editor(s)

© SPIE. Terms of Use
Back to Top