Share Email Print

Proceedings Paper

In situ aluminization of the MMT 6.5m primary mirror
Author(s): D. Clark; W. Kindred; J. T. Williams
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

In May, 2000 the MMT Conversion was dedicated. Space limitations on the summit of Mt. Hopkins, AZ and limited financial resources dictated in-situ aluminization of the φ 6.5m primary mirror. Some of the attendant challenges successfully addressed in the course of accomplishing that task are described. For example: a 22 metric ton, φ7m vacuum head had to be lifted 25m before being lowered through the horizon-pointing telescope truss (clearing by 16 mm), then secured to the mirror cell that serves as a vacuum vessel; dirty mirror-support hardware integral to the cell required isolation of the process volume operating at 10-6mbar; extensive modeling of source geometry was needed to achieve uniformity goals at very short source-substrate distances; and a cost-effective 75kW DC filament voltage source using commercially-available arc welders was developed that allowed simultaneous firing of 200 evaporation sources. Details of design and construction of the evaporation system are given along with techniques and results of the successful coating in November 2001 and September 2005.

Paper Details

Date Published: 6 July 2006
PDF: 13 pages
Proc. SPIE 6273, Optomechanical Technologies for Astronomy, 627305 (6 July 2006); doi: 10.1117/12.672492
Show Author Affiliations
D. Clark, MMT Observatory, Univ. of Arizona (United States)
W. Kindred, MMT Observatory, Univ. of Arizona (United States)
J. T. Williams, MMT Observatory, Univ. of Arizona (United States)

Published in SPIE Proceedings Vol. 6273:
Optomechanical Technologies for Astronomy
Eli Atad-Ettedgui; Joseph Antebi; Dietrich Lemke, Editor(s)

© SPIE. Terms of Use
Back to Top