Share Email Print
cover

Proceedings Paper

Mitigating project development and facility operation risks with systems engineering
Author(s): Wolfgang R. Ansorge
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

The presentation illustrates the standard life cycles and project phases of a typical large scale astronomical facility acqui-sition and development project and explains the role of Systems Engineering (SE) during the entire project life cycle. The basic SE philosophy and systematic SE approach are described and a road map identifying the main activities of SE during the individual project phases - from the requirement definition to the eventual validation of the erected system- is developed. In addition the presentation describes the methodologies and processes SE can offer to analyse the risks asso-ciated with the definition, development and implementation of large complex scientific infrastructure projects. Risk control methods and approaches which are necessary to systematically reduce the technical, financial and schedule risks to a level acceptable to the scientific / technical project management and to the funding agencies are explained.

Paper Details

Date Published: 16 September 2004
PDF: 8 pages
Proc. SPIE 5497, Modeling and Systems Engineering for Astronomy, (16 September 2004); doi: 10.1117/12.550924
Show Author Affiliations
Wolfgang R. Ansorge, RAMS-CON Management Consultants (Germany)


Published in SPIE Proceedings Vol. 5497:
Modeling and Systems Engineering for Astronomy
Simon C. Craig; Martin J. Cullum, Editor(s)

© SPIE. Terms of Use
Back to Top