An overview of the James Webb Space Telescope (JWST) project
Format Member Price Non-Member Price
PDF $14.40 $18.00

Paper Abstract

The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the recent selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

Paper Details

Date Published: 12 October 2004
PDF: 14 pages
Proc. SPIE 5487, Optical, Infrared, and Millimeter Space Telescopes, (12 October 2004); doi: 10.1117/12.549895
Show Author Affiliations
Phillip A. Sabelhaus, NASA Goddard Space Flight Ctr. (United States)
John E. Decker, NASA Goddard Space Flight Ctr. (United States)


Published in SPIE Proceedings Vol. 5487:
Optical, Infrared, and Millimeter Space Telescopes
John C. Mather, Editor(s)

© SPIE. Terms of Use
Back to Top