Share Email Print
cover

Proceedings Paper

Error budget procedure for Elmer image quality specification
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

Two different approaches are discussed for computing the expected ELMER image quality. The final Error Budget is computed in two different ways: a hierarchical model and a sequential model. The hierarchical model is the classical process for error budget building, in which the requirement degradation due to each error source is analyzed independently, combining all errors at the end. The sequential model follows the real design and fabrication process, simulating the steps sequentially. The results obtained in each step feed the following one, degrading the requirements from the Encircled Energy Radius (EER) design value to the final one. Finally, both results are compared.

Paper Details

Date Published: 5 February 2002
PDF: 10 pages
Proc. SPIE 4411, Large Lenses and Prisms, (5 February 2002); doi: 10.1117/12.454892
Show Author Affiliations
Ernesto Sanchez-Blanco Mancera, GRANTECAN S.A. (Spain)


Published in SPIE Proceedings Vol. 4411:
Large Lenses and Prisms

© SPIE. Terms of Use
Back to Top