Share Email Print
cover

Proceedings Paper

Status of display systems in B-52H
Author(s): Darrel G. Hopper; Frederick M. Meyer; Kenneth E. Wodke
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

Display technologies for the B-52 were selected some 40 years ago have become unsupportable. Electromechanical and old cathode ray tube technologies, including an exotic six-gun 13 in. tube, have become unsupportable due to the vanishing vendor syndrome. Thus, it is necessary to insert new technologies which will be available for the next 40 years to maintain the capability heretofore provided by those now out of favor with the commercial sector. With this paper we begin a look at the status of displays in the B-52H, which will remain in inventory until 2046 according to current plans. From a component electronics technology perspective, such as displays, the B-52H provides several 10-year life cycle cost (LCC) planning cycles to consider multiple upgrades. Three Productivity, Reliability, Availability, and Maintainability (PRAM) projects are reviewed to replace 1950s CRTs in several sizes: 3, 9, and 13 in. A different display technology has been selected in each case. Additional display upgrades in may be anticipated and are discussed.

Paper Details

Date Published: 16 August 1999
PDF: 10 pages
Proc. SPIE 3690, Cockpit Displays VI: Displays for Defense Applications, (16 August 1999); doi: 10.1117/12.357623
Show Author Affiliations
Darrel G. Hopper, Air Force Research Lab. (United States)
Frederick M. Meyer, Air Force Research Lab. (United States)
Kenneth E. Wodke, Air Force Research Lab. (United States)


Published in SPIE Proceedings Vol. 3690:
Cockpit Displays VI: Displays for Defense Applications
Darrel G. Hopper, Editor(s)

© SPIE. Terms of Use
Back to Top