Share Email Print
cover

Proceedings Paper

Design optimization for the main amplification stage of Technical Integration Line (TIL)
Author(s): Feng Jing; Xiao Min Zhang; Qihua Zhu; Yongzai Man; Hansheng Peng
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

A four pass amplifier system with a small aperture beam reverser has been designed as the main amplifier stage of Technical Integration Line (TIL). TIL is the full scale two- beam prototype for Shenguang-III laser facility which will produce 1 kJ of UV radiation on the target from each beam in 1-3 nanoseconds shaped pulses. The variables were optimized for a fixed output beam aperture of 25 X 25 cm2 and the given parameters of the optical components under the constraints of amplifier gain, fluency damage/filamentation and so on. As a result, the baseline design for TIL was set to a 9-5 configuration.

Paper Details

Date Published: 23 July 1999
PDF: 6 pages
Proc. SPIE 3492, Third International Conference on Solid State Lasers for Application to Inertial Confinement Fusion, (23 July 1999); doi: 10.1117/12.354144
Show Author Affiliations
Feng Jing, Southwest Institute of Nuclear Physics and Chemistry (China)
Xiao Min Zhang, Southwest Institute of Nuclear Physics and Chemistry (China)
Qihua Zhu, Southwest Institute of Nuclear Physics and Chemistry (China)
Yongzai Man, Southwest Institute of Nuclear Physics and Chemistry (China)
Hansheng Peng, Southwest Institute of Nuclear Physics and Chemistry (China)


Published in SPIE Proceedings Vol. 3492:
Third International Conference on Solid State Lasers for Application to Inertial Confinement Fusion
W. Howard Lowdermilk, Editor(s)

© SPIE. Terms of Use
Back to Top