Share Email Print
cover

Proceedings Paper

Advanced Mirror Technology Development (AMTD) project: overview and year four accomplishments
Author(s): H. Philip Stahl
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

The Advanced Mirror Technology Development (AMTD) project is in Phase 2 of a multiyear effort initiated in Fiscal Year (FY) 2012, to mature toward the next Technology Readiness Level (TRL) critical technologies required to enable 4-m-or-larger monolithic or segmented ultraviolet, optical, and infrared (UVOIR) space telescope primary-mirror assemblies for general astrophysics and ultra-high-contrast observations of exoplanets. Key hardware accomplishments of 2015/16 are the successful low-temperature fusion of a 1.5-meter diameter ULE mirror that is a 1/3rd scale model of a 4-meter mirror and the initiation of polishing of a 1.2-meter Extreme-Lightweight Zerodur mirror. Critical to AMTD’s success is an integrated team of scientists, systems engineers, and technologists; and a science-driven systems engineering approach.

Paper Details

Date Published: 22 July 2016
PDF: 7 pages
Proc. SPIE 9912, Advances in Optical and Mechanical Technologies for Telescopes and Instrumentation II, 99120S (22 July 2016); doi: 10.1117/12.2234082
Show Author Affiliations
H. Philip Stahl, NASA Marshall Space Flight Ctr. (United States)


Published in SPIE Proceedings Vol. 9912:
Advances in Optical and Mechanical Technologies for Telescopes and Instrumentation II
Ramón Navarro; James H. Burge, Editor(s)

© SPIE. Terms of Use
Back to Top