Share Email Print
cover

Proceedings Paper

Status of PAL-XFEL
Author(s): H.-S. Kang; K.-W. Kim; I. S. Ko
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

The PAL-XFEL, a 0.1-nm hard X-ray FEL facility consisting of a 10-GeV S-band linac, is being constructed in Pohang, South Korea. Its building construction was completed at the end of 2014. The major procurement contracts were complete for the critical components of S-band linac modules and undulators. The installation of linac, undulator, and beam line will be completed by 2015. The commissioning will get started in January 2016 aiming for the first lasing in 2016. We will report the current status, construction progress, and commissioning plans for the PAL XFEL project, including major subsystem preparations.

Paper Details

Date Published: 12 May 2015
PDF: 8 pages
Proc. SPIE 9512, Advances in X-ray Free-Electron Lasers Instrumentation III, 95120P (12 May 2015); doi: 10.1117/12.2183141
Show Author Affiliations
H.-S. Kang, Pohang Accelerator Lab. (Korea, Republic of)
K.-W. Kim, Pohang Accelerator Lab. (Korea, Republic of)
I. S. Ko, Pohang Accelerator Lab. (Korea, Republic of)


Published in SPIE Proceedings Vol. 9512:
Advances in X-ray Free-Electron Lasers Instrumentation III
Sandra G. Biedron, Editor(s)

© SPIE. Terms of Use
Back to Top