Share Email Print

Proceedings Paper

ASTER instrument calibration plan
Author(s): Akira Ono; Fumihiro Sakuma
Format Member Price Non-Member Price
PDF $14.40 $18.00
cover GOOD NEWS! Your organization subscribes to the SPIE Digital Library. You may be able to download this paper for free. Check Access

Paper Abstract

ASTER is composed of three radiometers for separate wavelength regions: visible and near infrared radiometer (VNIR) and short wavelength infrared radiometer (SWIR) both in the solar reflection region, and thermal infrared radiometer (TIR) in the thermal emission region. Each radiometer will be calibrated before launch on the ground, and after launch in orbit. This paper describes the calibration plan of ASTER radiometer.

Paper Details

Date Published: 25 August 1993
PDF: 12 pages
Proc. SPIE 1939, Sensor Systems for the Early Earth Observing System Platforms, (25 August 1993); doi: 10.1117/12.152847
Show Author Affiliations
Akira Ono, National Research Lab. of Metrology (Japan)
Fumihiro Sakuma, National Research Lab. of Metrology (Japan)

Published in SPIE Proceedings Vol. 1939:
Sensor Systems for the Early Earth Observing System Platforms
William L. Barnes, Editor(s)

© SPIE. Terms of Use
Back to Top